[{"data":1,"prerenderedAt":647,"buildId":648},["ShallowReactive",2],{"breadcrumbs:\u002Fspecifications\u002Flife-cycle":3,"feed:\u002Fspecifications\u002Flife-cycle":10,"page:\u002Fspecifications\u002Flife-cycle":11,"sections:\u002Fspecifications\u002Flife-cycle":458,"site:footer":461,"site:navigation":522,"site:settings":613},[4,7],{"to":5,"label":6},"\u002F","Eclipse Foundation Project Handbook",{"to":8,"label":9},"\u002Fspecifications\u002F","Specifications",false,{"id":12,"title":13,"aliases":14,"body":15,"breadcrumbTitle":14,"breadcrumbs":14,"date":14,"description":450,"extension":451,"featuredFooter":14,"header":14,"keywords":14,"meta":452,"navigation":453,"path":454,"redirectUrl":14,"rssFeed":14,"seo":455,"seoTitle":14,"socialImage":14,"stem":456,"visibility":14,"width":14,"__hash__":457},"pages\u002F13.specifications\u002F7.life-cycle.md","Specification Project Life Cycle",null,{"type":16,"value":17,"toc":435},"minimark",[18,28,47,52,72,85,96,104,107,112,115,137,140,143,146,149,153,160,172,187,190,194,201,219,239,243,253,261,265,272,292,307,311,314,317,330,333,337,351,357,372],[19,20,21,22,27],"p",{},"Like regular Eclipse open source projects, a specification project starts life as a ",[23,24,26],"a",{"href":25},"\u002Fstarting-a-project\u002Fproject-proposal\u002F","proposal"," with a description, scope, list of committers, and more; goes through an iterative development cycle that produces one or more milestone builds; and then engages in a release process.",[29,30,32,40],"media",{"size":31},"natural",[19,33,34],{},[35,36],"img",{"alt":37,"src":38,"width":39},"specifications life cycle","\u002Fimages\u002Fspecifications\u002Fspecifications-life-cycle.svg",533,[41,42,44],"template",{"v-slot:caption":43},"",[19,45,46],{},"An overview of the Eclipse Foundation Specification Process",[48,49,51],"h2",{"id":50},"specification-committee","Specification Committee",[19,53,54,55,61,62,66,67,71],{},"Unlike a “regular” Eclipse open source project, a specification project must be aligned with exactly one ",[23,56,60],{"href":57,"rel":58},"https:\u002F\u002Fwww.eclipse.org\u002Forg\u002Fworkinggroups\u002F",[59],"nofollow","working group",". Each working group designates a ",[63,64,65],"em",{},"specification committee"," that maintains and manages the specification process on the working group’s behalf. A specification project must get ",[23,68,70],{"href":69},"\u002Fspecifications\u002Flife-cycle\u002F#specification-committee-ballots","approval"," from the corresponding specification committee to pass key project life cycle events.",[19,73,74,75,80,81,84],{},"The specification committee is ultimately responsible for ensuring that the final specifications produced by their working group’s specification projects make sense. The definition of “makes sense” varies by specification committee and specification committee participant, but is generally understood to mean ensuring that the specification teams keep within their defined scope, that the specifications they produce can be implemented, and that those aspects of the ",[23,76,79],{"href":77,"rel":78},"https:\u002F\u002Feclipse.org\u002Forg\u002Fdocuments\u002FEclipse_IP_Policy.pdf",[59],"Eclipse Intellectual Property Policy"," with regard to ",[63,82,83],{},"essential claims"," are observed. In practical terms, specification committee participants wield power via the ballots that are required to approve key life cycle events per the EFSP.",[19,86,87,88,95],{},"The Specification Committee is responsible for producing, publishing, and maintaining operational guidance documentation for specification projects. This includes the minimum requirements and process for producing a ",[23,89,92],{"href":90,"rel":91},"https:\u002F\u002Fwww.eclipse.org\u002Fprojects\u002Fefsp\u002F#efsp-ratification",[59],[63,93,94],{},"final specification",". It also includes operational guidance for running a specifications TCK for the purpose of testing for compatibility.",[19,97,98,99,103],{},"The Specification Chair (or their delegate) is responsible for initiating ballots, tallying their results, disseminating them to the community, and (when appropriate; e.g., in the case a ",[23,100,102],{"href":101},"\u002Fspecifications\u002Flife-cycle\u002F#release-review","release review"," ballot) reporting them to the EMO.",[19,105,106],{},"The Specification Committee is also responsible for defining and refining how they implement the EFSP for those specification projects under their purview.",[108,109,111],"h3",{"id":110},"specification-committee-ballots","Specification Committee Ballots",[19,113,114],{},"The specification committee is required to engage in a formal ballot to approve key milestones in the life cycle of their specification projects. The exact means by which ballots are run varies by working group. The following life cycle events require the approval of the working group’s specification committee:",[116,117,118,122,125,128,131,134],"ul",{},[119,120,121],"li",{},"Specification project creation;",[119,123,124],{},"Release plan;",[119,126,127],{},"Revision to the scope;",[119,129,130],{},"Progress and release reviews;",[119,132,133],{},"Service releases; and",[119,135,136],{},"Designation of a profile or platform.",[19,138,139],{},"By default all ballots require seven days. Some specification committees may increase the length of time for some or all ballots, or add additional constraints.",[19,141,142],{},"To succeed, a vote requires positive responses from a supermajority (defined as two-thirds) of the members of the specification committee. Votes to designate a specification as a profile or platform require positive responses from a supermajority of the specification committee members who represent the interests of Strategic Members of the Eclipse Foundation. It’s worth noting that there is no veto.",[19,144,145],{},"The criteria by which representatives decide how they’re going to vote varies by individual and according to the values of the individual and the organisation that they represent (if applicable). Minimally, the specification committee is expected to use their vote to ensure that specification projects stay within scope. In the case of a progress review, the voters will need to consider whether or not the project is progressing in a manner that will eventually result in a successful vote on the eventual release review that gates the ratification of the final specification.",[19,147,148],{},"In the event of a failure, the specification committee will provide feedback regarding the reason for the failure to the project team, who will work to mitigate issues and then re-engage.",[48,150,152],{"id":151},"creation-review","Creation Review",[19,154,155,159],{},[23,156,158],{"href":157},"\u002Freleases-and-reviews\u002Fcreation-reviews\u002F","Creation reviews"," give the community a last opportunity to review and comment on a new project proposal before it is created.",[19,161,162,163,167,168,171],{},"The specification committee needs to approve of the creation of a specification project from a proposal by taking a role in the creation review. The expectation is that the specification committee members will consider the details of a proposed specification project (with particular focus on the scope) before making their decision. In addition to the requirements defined by the ",[23,164,166],{"href":165},"\u002Fdevelopment-process\u002F","Eclipse Foundation Development Process"," (EDP), a ",[23,169,170],{"href":69},"supermajority ballot"," of the entire specification committee is required to approve a creation review.",[173,174,175],"blockquote",{},[19,176,177,181,182,186],{},[178,179,180],"strong",{},"Tip:"," Contact the ",[23,183,185],{"href":184},"mailto:emo@eclipse-foundation.org","EMO"," to initiate a creation review.",[19,188,189],{},"Following successful creation and provisioning of project resources, a specification project team begins development.",[48,191,193],{"id":192},"specification-development","Specification Development",[19,195,196,197,200],{},"During the development cycle, the project team will produce one or more ",[63,198,199],{},"milestone builds"," to provide a means for the community to provide feedback.",[173,202,203],{},[19,204,205,208,209,212,213,218],{},[178,206,207],{},"Warning:"," A milestone build must never be used to claim compatibility with a specification. An implementation of a specification may only be considered ",[63,210,211],{},"compatible"," when it is based on a ",[23,214,216],{"href":215},"\u002Fspecifications\u002Flife-cycle\u002F#final-specification",[63,217,94],{},".",[19,220,221,222,226,227,231,232,238],{},"A development cycle begins when a either a ",[23,223,225],{"href":224},"\u002Fspecifications\u002Flife-cycle\u002F#creation-review","creation review"," or a ",[23,228,230],{"href":229},"\u002Fspecifications\u002Flife-cycle\u002F#plan-review","plan review"," is declared successful. A specification project team must engage in a ",[23,233,235],{"href":234},"\u002Fspecifications\u002Flife-cycle\u002F#progress-review",[63,236,237],{},"progress review"," when a development cycle exceeds one year in duration.",[48,240,242],{"id":241},"progress-review","Progress Review",[19,244,245,246,250,251,218],{},"For a progress review, the ",[23,247,249],{"href":248},"\u002Fproject-roles\u002Fproject-management-committee\u002F","Project Management Committee"," (PMC) and Eclipse Management Organization (EMO) validate that the specification project team is following the EDP and EFSP, and that the Eclipse Foundation’s Intellectual Property Policy is being correctly implemented. The EFSP requires that the specification committee approve a progress review by ",[23,252,170],{"href":69},[173,254,255],{},[19,256,257,260],{},[178,258,259],{},"Note:"," The intent of the progress review is to ensure that the specification project is progressing in a manner that will ultimately result in a successful release. A specification committee or project leadership may compel a specification project to engage in additional progress reviews.",[48,262,264],{"id":263},"release-review","Release Review",[19,266,267,268,271],{},"A specification project team ",[178,269,270],{},"must"," engage in a release review for every release (major, minor, and service).",[19,273,274,275,278,279,282,283,285,286,289,290,218],{},"At the end of every development cycle, the project team must produce a ",[63,276,277],{},"release candidate"," build that is designated as a ",[63,280,281],{},"specification version"," and then engage in a ",[63,284,102],{},". For a release review, the PMC, EMO, and specification committee all engage in the same sorts of activities that they do for a progress review, but with the understanding that approval results in the ",[63,287,288],{},"ratification"," of the specification and promotion to an official status. The EFSP requires that the specification committee approve a release review by ",[23,291,170],{"href":69},[173,293,294],{},[19,295,296,298,299,303,304,306],{},[178,297,180],{}," To engage in a release review, create a ",[23,300,302],{"href":301},"\u002Fproject-management-infrastructure\u002Freleases-and-reviews\u002F","release record"," (if one has not already been created as part of the planning process) and contact the ",[23,305,185],{"href":184}," to schedule the review. Your PMC and specification committee may provide additional requirements and documentation that must be met to get their approval of the review.",[48,308,310],{"id":309},"plan-review","Plan Review",[19,312,313],{},"Following a successful first release (and every subsequent release thereafter), and before engaging in any further development of the specification, the project team must assemble and present their Plan for review by the Specification Committee via Plan Review. The notion of a Plan Review is specific to the EFSP (since Plan Reviews are not part of the EDP, no formal involvement from the PMC is required). A Plan Review provides the Specification Committee with an opportunity to ensure that the plan for the next Specification Version is in-scope, fits within the overall vision of the Working Group, and is otherwise charting a path to eventual ratification and release. The EFSP requires that the Specification Committee approve a Plan Review by supermajority vote.",[19,315,316],{},"The plan itself must be in-scope (that is, all new work must fall within the bounds defined by the specification project’s scope) and must be developed in consideration of the concerns of stakeholders. It must, for example, take plans of the PMC or associated working group into consideration . The concerns of the project team must also be taken into consideration when creating a plan.",[173,318,319],{},[19,320,321,323,324,326,327,329],{},[178,322,180],{}," To engage in a plan review, create a ",[23,325,302],{"href":301}," and contact the ",[23,328,185],{"href":184}," to schedule a review.",[19,331,332],{},"After the Plan is approved, the Project Team engages in Development as before.",[48,334,336],{"id":335},"final-specification","Final Specification",[19,338,339,340,343,344,346,347,218],{},"Following a successful release review, the final release version of the specification artifacts are considered ",[63,341,342],{},"ratified"," and transmogrifies into what the EFSP refers to as a ",[63,345,94],{},". It is the final specification that must be used to build ",[23,348,350],{"href":349},"\u002Fspecifications\u002Fcompatible-implementations\u002F","compatible implementations",[19,352,353,354,356],{},"All versions of specifications that are referenced by a ratified final specification must themselves be ratified. The ",[23,355,102],{"href":101}," for related specification versions may be run concurrently.",[19,358,359,360,365,366,371],{},"Final Specifications and their associated artifacts are distributed under specific licenses. The specification document for the final specification must be distributed as read-only text (e.g., PDF) under the ",[23,361,364],{"href":362,"rel":363},"https:\u002F\u002Fwww.eclipse.org\u002Flegal\u002Fefsl\u002F",[59],"Eclipse Foundation Specification License",". The ratified TCK in composite is distributed under the ",[23,367,370],{"href":368,"rel":369},"https:\u002F\u002Fwww.eclipse.org\u002Flegal\u002Ftck\u002F",[59],"Eclipse Foundation TCK License",". Other technical artifacts must be distributed under an open source license (normally the specification project’s license).",[373,374,375,379],"page-sidebar",{},[108,376,378],{"id":377},"in-this-chapter","In this chapter",[116,380,381,385,391,397,403,409,415,420,424,429],{},[119,382,383],{},[23,384,9],{"href":8},[119,386,387],{},[23,388,390],{"href":389},"\u002Fspecifications\u002Fspecification-project-reviews\u002F","Specification Project Reviews",[119,392,393],{},[23,394,396],{"href":395},"\u002Fspecifications\u002Fintellectual-property-flow\u002F","Intellectual Property Flow",[119,398,399],{},[23,400,402],{"href":401},"\u002Fspecifications\u002Fparticipant-representative-committers\u002F","Participant Representative Committers",[119,404,405],{},[23,406,408],{"href":407},"\u002Fspecifications\u002Fcontributors\u002F","Contributors",[119,410,411],{},[23,412,414],{"href":413},"\u002Fspecifications\u002Fcommitters\u002F","Committers",[119,416,417],{},[23,418,364],{"href":419},"\u002Fspecifications\u002Fspecification-license\u002F",[119,421,422],{},[178,423,13],{},[119,425,426],{},[23,427,428],{"href":349},"Compatible Implementations",[119,430,431],{},[23,432,434],{"href":433},"\u002Fspecifications\u002Ffaq\u002F","Frequently Asked Questions",{"title":43,"searchDepth":436,"depth":436,"links":437},2,[438,442,443,444,445,446,447],{"id":50,"depth":436,"text":51,"children":439},[440],{"id":110,"depth":441,"text":111},3,{"id":151,"depth":436,"text":152},{"id":192,"depth":436,"text":193},{"id":241,"depth":436,"text":242},{"id":263,"depth":436,"text":264},{"id":309,"depth":436,"text":310},{"id":335,"depth":436,"text":336,"children":448},[449],{"id":377,"depth":441,"text":378},"Like regular Eclipse open source projects, a specification project starts life as a proposal with a description, scope, list of committers, and more; goes through an iterative development cycle that produces one or more milestone builds; and then engages in a release process.","md",{},true,"\u002Fspecifications\u002Flife-cycle",{"title":13,"description":450},"13.specifications\u002F7.life-cycle","DDlAR0m5tKpeTGrH3Q5Qatl0TGIAEd5BJu3p4oK7A_0",[459],{"path":460,"title":9,"visibility":14},"\u002Fspecifications",{"id":462,"backToTopText":14,"callToAction":14,"colorMode":463,"copyright":468,"description":469,"extension":470,"manageCookiesText":471,"meta":472,"sections":473,"socialsHeading":519,"stem":520,"__hash__":521},"footer\u002Fdata\u002Ffooter.yml",{"label":464,"system":465,"light":466,"dark":467},"Colour mode","System","Light","Dark","Copyright © Eclipse Foundation AISBL. All Rights Reserved.","How open source projects are proposed, run and released at the Eclipse Foundation.","yml","Manage Cookies",{},[474,487,500],{"id":475,"heading":476,"links":477},"footer-eclipse-foundation","Eclipse Foundation",[478,481,484],{"text":479,"href":480},"About","https:\u002F\u002Fwww.eclipse.org\u002Forg\u002F",{"text":482,"href":483},"Projects","https:\u002F\u002Fprojects.eclipse.org\u002F",{"text":485,"href":486},"Membership","https:\u002F\u002Fwww.eclipse.org\u002Fmembership\u002F",{"id":488,"heading":489,"showManageCookies":453,"links":490},"footer-legal","Legal",[491,494,497],{"text":492,"href":493},"Privacy Policy","https:\u002F\u002Fwww.eclipse.org\u002Flegal\u002Fprivacy\u002F",{"text":495,"href":496},"Terms of Use","https:\u002F\u002Fwww.eclipse.org\u002Flegal\u002Fterms-of-use\u002F",{"text":498,"href":499},"Code of Conduct","https:\u002F\u002Fwww.eclipse.org\u002Forg\u002Fdocuments\u002FCommunity_Code_of_Conduct.php",{"id":501,"heading":502,"links":503},"footer-site","Eclipse Project Handbook",[504,507,510,513,516],{"text":505,"href":506},"Overview","\u002Foverview\u002F",{"text":508,"href":509},"Project checklist","\u002Fproject-checklist\u002F",{"text":511,"href":512},"Glossary","\u002Fglossary\u002F",{"text":514,"href":515},"Getting help","\u002Fgetting-help\u002F",{"text":517,"href":518},"Change log","\u002Fchange-log\u002F","Follow us:","data\u002Ffooter","ZvhD6CFXH27OiD2yqB3mjl9Df8GotJScE3ITS4beP3s",{"id":523,"extension":470,"main":524,"meta":610,"stem":611,"__hash__":612},"navigation\u002Fdata\u002Fnavigation.yml",[525,537,558,582,600],{"text":526,"children":527},"Getting started",[528,529,532,535,536],{"text":505,"href":506},{"text":530,"href":531},"Starting a project","\u002Fstarting-a-project\u002F",{"text":533,"href":534},"Incubation","\u002Fincubation\u002F",{"text":508,"href":509},{"text":514,"href":515},{"text":538,"children":539},"People",[540,543,546,549,552,555],{"text":541,"href":542},"Project roles","\u002Fproject-roles\u002F",{"text":544,"href":545},"Contributing","\u002Fcontributing\u002F",{"text":547,"href":548},"Elections","\u002Felections\u002F",{"text":550,"href":551},"Committer paperwork","\u002Fcommitter-paperwork\u002F",{"text":553,"href":554},"Identity verification","\u002Fidentity-verification\u002F",{"text":556,"href":557},"Community","\u002Fcommunity\u002F",{"text":559,"children":560},"Running a project",[561,564,567,570,573,576,579],{"text":562,"href":563},"Resources and services","\u002Fproject-resources-and-services\u002F",{"text":565,"href":566},"Project Management Infrastructure","\u002Fproject-management-infrastructure\u002F",{"text":568,"href":569},"Releases and reviews","\u002Freleases-and-reviews\u002F",{"text":571,"href":572},"Vulnerabilities","\u002Fvulnerabilities\u002F",{"text":574,"href":575},"Software Bill of Materials","\u002Fsoftware-bill-of-materials\u002F",{"text":577,"href":578},"Project branding","\u002Fproject-branding\u002F",{"text":580,"href":581},"Promoting your project","\u002Fpromoting-your-project\u002F",{"text":583,"children":584},"IP and legal",[585,588,591,594,597],{"text":586,"href":587},"Intellectual property","\u002Fintellectual-property\u002F",{"text":589,"href":590},"Using artificial intelligence","\u002Fartificial-intelligence\u002F",{"text":592,"href":593},"Legal documentation","\u002Flegal-documentation\u002F",{"text":595,"href":596},"Legal documentation for plug-ins","\u002Flegal-documentation-for-plug-ins\u002F",{"text":598,"href":599},"Data protection impact assessment","\u002Fdata-protection-impact-assessment\u002F",{"text":601,"children":602},"Process",[603,604,605,606,607],{"text":166,"href":165},{"text":9,"href":8},{"text":511,"href":512},{"text":517,"href":518},{"text":608,"href":609},"Notices","\u002Fnotices\u002F",{},"data\u002Fnavigation","fgy6mUpUX6VDgpStO8SkJA34CgOFyHHPtqwYQUgtSYk",{"id":614,"title":502,"assistant":615,"callForAction":14,"description":624,"extension":470,"heroImage":14,"keywords":625,"logo":629,"logoInverse":630,"logoWidth":631,"meta":632,"seoTitleSuffix":633,"socialImage":634,"socials":636,"stem":645,"__hash__":646},"settings\u002Fdata\u002Fsettings.yml",{"name":616,"intro":617,"disclaimer":618,"instructions":619,"questions":620},"Handbook assistant","Ask how things work for an Eclipse open source project: starting one, committers, releases, intellectual property. The answers come from the handbook, with links to its pages.","The handbook assistant can make mistakes and doesn't provide legal advice. Check the pages it links to.","The handbook chooses its words with care. Use its wording for the process, roles, reviews, agreements, licences and terms; quote it where precision matters, and don't paraphrase or simplify it.\nBe plain and precise. Don't speculate, don't predict the outcome of a review, an election or an IP review, and don't speak for the EMO, the IP Team, a PMC or the Eclipse Foundation beyond what the pages say.\nYou don't provide legal advice. When a question is about licensing, intellectual property, trademarks or the agreements, or asks what someone must do to comply, say first that this isn't legal advice, then give what the handbook says, and suggest they contact license@eclipse-foundation.org, as the handbook does, or a qualified legal professional.\nWhen the handbook doesn't answer a question, say so and suggest the EMO at emo@eclipse-foundation.org.\n",[621,622,623],"How do I propose a new Eclipse open source project?","How do committer elections work?","What is a release review, and when does my project need one?","How open source projects are proposed, run and released at the Eclipse Foundation: the Eclipse Development Process in practice, for committers and project leads.",[502,626,476,627,628],"Eclipse Development Process","open source projects","committers","\u002Flogo.svg","\u002Flogo-inverse.svg",140,{}," | Eclipse Project Handbook",{"backgroundImage":635,"eyebrow":502},"\u002Fsocial-image.png",[637,641],{"name":638,"icon":639,"url":640},"LinkedIn","fa6-brands:linkedin","https:\u002F\u002Fwww.linkedin.com\u002Fcompany\u002Feclipse-foundation\u002F",{"name":642,"icon":643,"url":644},"YouTube","fa6-brands:youtube","https:\u002F\u002Fwww.youtube.com\u002F@EclipseFdn","data\u002Fsettings","1y81bWZuCroo6bWBcHFO-k_z4AIvgSDeHc7Uqzsj2LM",1795617575404,"efc157c9-2c20-419c-a89d-97024324e8ad"]